Installation Of Your New Bathroom
LocalPlumber-UK carries out all parts of your bathroom installation from removing your old bathroom, preparing the walls and floor, 1st fix, tiling walls and installing floor covering, 2nd fix your new bathroom suite and finish by cleaning your bathroom and disposing of the rubbish by skip hire.
Stage One - Removing old Bathroom
This includes removing all your old bathroom which includes removing your old bathroom suite, wall coverings and wall tiles or wallpaper, and flooring.
Stage Two - Preparing the walls and floor
Once all the old tiles have been removed from the walls we carry out all repairs such as replastering the walls or replacing plasterboard so that the walls are in a good condition for tiles, wallboard or painting.
If you have floor tiles on the floor already the floor may need to be repaired or replaced depending on how the previous floor tiles were installed and then we install backer board onto the floor boards or chipboard flooring ready for floor tiles or plywood for other flooring types.
Stage Three - 1st Fix
At this point, we start to carry out any plumbing that is required including moving water pipework or waste pipes, once this has been finished we start to install a couple of items into your bathrooms such as a shower tray or bath ready for tiling or wall boards, at this point if you need electrics done for an electric shower or lighting, this will also be done at this stage.
Stage Four- Tiling Walls and Floor Covings
Now that the walls are prepared and the basic parts of the bathroom suite are installed the tiling can start, the tiling is done either by the same engineer or one of our tiles, this depends on the amount of wall and floor tiling that is required.
Stage Six - 2nd fix Bathroom
Once the tiler has finished, we will return and start to install all the other parts that make up your bathrooms such as the toilet, basin showers and enclosures, and bath panels this would also be the time that the electrical would return and finish the lighting or even connecting a bathroom TV
Stage Five - Finish & Clean
Once we have finished installing the last parts of your bathroom we then clean the room from top to bottom so you don't have to, then silicone seal for that finishing touch. At this point, we start to clear up all the rubbish and a skip arrives to dispose of all your old bathroom suite and any other rubbish.